New evaluation
Fill the sections in order; required fields are marked *. Drop your bills in section 2 and most of it is read for you. Open ? beside a field for what it means and where it is used.
Your factory
Who you are, where the plant is and how it runs.
DISCOM and connection
Drop your bills and ergPLAN reads the DISCOM, category, voltage and demand; or pick them.
PDF, as the DISCOM sends them, scanned or digital; a file may hold several months. ergPLAN reads the DISCOM, tariff category, voltage, contract demand and each month's units, and links every figure to the page it is printed on. Twelve months give the best profile; one is enough to start.
Consumption
A year of units: from the bills, or typed.
Today's bill and open access
What a year costs now, the open access you already take, your existing assets.
What to evaluate
Rooftop solar, a battery, open-access solar, wind or hybrid, group captive, the power exchange.
Tick everything you would consider. The optimizer sizes each at least cost over a year of hourly blocks under your state's open-access charges, losses and banking rules, and may leave a source at zero if it does not pay. 0 selected.
Analysis settings
25-year horizon, escalations, discount rate, resolution.