jouleWise ergPLAN 2
Inputs

New evaluation

Fill the sections in order; required fields are marked *. Drop your bills in section 2 and most of it is read for you. Open ? beside a field for what it means and where it is used.

Your factory

Who you are, where the plant is and how it runs.

Weekly off
ticked = the plant is off

DISCOM and connection

Drop your bills and ergPLAN reads the DISCOM, category, voltage and demand; or pick them.

Drop your electricity bills here

PDF, as the DISCOM sends them, scanned or digital; a file may hold several months. ergPLAN reads the DISCOM, tariff category, voltage, contract demand and each month's units, and links every figure to the page it is printed on. Twelve months give the best profile; one is enough to start.

or type the connection
kV
kVA

Consumption

A year of units: from the bills, or typed.

kWh
kVA

What to evaluate

Rooftop solar, a battery, open-access solar, wind or hybrid, group captive, the power exchange.

0 selected

Tick everything you would consider. The optimizer sizes each at least cost over a year of hourly blocks under your state's open-access charges, losses and banking rules, and may leave a source at zero if it does not pay. 0 selected.

OPEN-ACCESS PLANT · ELSEWHERE IN THE STATEYOUR SITE · BEHIND THE METEROpen-access windnot in the planOpen-access solarnot in the planBattery at the plantnot in the planDISCOM gridRooftop solarnot in the planBattery behind the meternot in the plan
Your plan as you set it: switch a component on or off and give its target below. The optimizer sizes each one; the results show this picture with the sizes it chose.